West Overpass project: Reconstruction of the existing roadway including the intersection with the Truck Bypass and Airport Road; construction of a pedestrian/bicycle path; culverts, waterlines, storm drains, signing and electrical; removal of an abandoned railroad overpass on Hwy 87 in Lewistown. The overall project was located between RP 79.0 and 81. Sidewalks: construction with signing and electrical in three locations along Main Street (Hwy 87) in Lewistown: West Main between 13th Ave. and 7th Ave.; East Main between Dawes St. and Ridgelawn Ave.; and West Main between 15th Ave. and 13th Ave. City Loop Path: paving of the remaining graveled portion of the pedestrian/bicycle patch. Project is located along a 1.7 mile section of abandoned railroad trail between A St. and the intersection of Miller St. with West Main St.

Type
Urban Road Rehabilitation
Industry
Public Road Construction
Client
Montana Department of Transportation, Billings District
Price Range
$10-11 million